1-Page PDF Summary of Governance of Portfolios, Programs, and Projects
Governing initiatives at every level—portfolio, program, and project—is vital to aligning organizational efforts with strategic goals. The Project Management Institute's Governance of Portfolios, Programs, and Projects provides a comprehensive framework for implementing robust governance, from clarifying the distinct roles of governance versus management, to establishing processes that apply across all initiative types.
This guide takes you through a systemic approach to governance, beginning with assessing your existing practices and devising tailored plans to enhance oversight. You'll learn specific techniques to strengthen governance for portfolios, aligning investments with strategic priorities; programs, harmonizing components for maximum benefit realization; and projects, ensuring expected outcomes are achieved.
(continued)...
- The assessment phase is crucial, but there is a risk of analysis paralysis where too much time is spent on assessing and not enough on action.
- Initial planning is necessary, but plans can quickly become outdated in a rapidly changing business environment, necessitating a more flexible and adaptive approach.
- During the implementation phase, the risk of resistance to change can be high, and the success of new governance frameworks often depends on the organization's culture and the individuals' willingness to embrace new processes.
- The enhancement phase is aimed at continuous improvement, but it can be challenging to measure the true effectiveness of governance practices, and there may be a delay in seeing the benefits of changes made.
Developing and enhancing oversight processes for portfolios.
The section focuses on enhancing governance throughout various portfolios to ensure they are in sync with the primary strategic objectives and to optimize investment returns. PMI emphasizes the importance of aligning portfolio governance with the strategic objectives of the organization and establishing a clear decision-making structure.
Effective oversight, coordination, and decision-making processes are ensured through the comprehensive administration of a portfolio.
The Project Management Institute defines portfolio governance as establishing and upholding a framework, delineating responsibilities, and implementing processes that guide portfolio management to guarantee that investments are in sync with the strategic and operational goals of the organization. Decisions pertaining to the portfolio are ensured to align with the strategic goals of the organization, and investment management is carried out with efficiency.
The governance of the portfolio must be designed in a way that aligns with the organization's strategic goals, thus improving the allocation of investment resources.
The entity referred to as the Project Management Institute asserts that the management and configuration of a portfolio should be in harmony with the company's strategic goals. Decisions are taken to pinpoint, prioritize, and sanction a range of initiatives, encompassing projects and programs, to guarantee alignment with the organization's overarching objectives. The portfolio undergoes periodic assessments to confirm its alignment with the organization's shifting priorities and to adapt to changes in the environment, ensuring that the expected outcomes of the investments are realized.
The creation of a governance structure for portfolios clarifies decision-making authority and related duties.
PMI emphasizes the importance of clearly delineating responsibilities and roles within the portfolio's governance structure. The organization of the portfolio should facilitate transparent decision-making, establish boundaries of control, and maintain accountability. Effective management of a collection of projects and programs requires clear definition of roles among the oversight board, the individual overseeing the portfolio, the group tasked with portfolio supervision, and all key stakeholders involved in the portfolio's scrutiny.
Portfolio governance is defined by structured methods used to prioritize, authorize, and supervise its different components.
The Project Management Institute advocates for the establishment of unique processes for prioritizing, approving, and overseeing the different components within the portfolio. The organization's long-term objectives ought to align with clearly defined criteria for establishing priorities, set limits for approval, and metrics for monitoring progress. The framework for governance establishes transparent rules and ensures a consistent and fair approach to making decisions. The organization can ensure that its investments align with overarching goals and that resources are used efficiently by setting clear criteria for the distribution and ranking of resources. Prior to approval, there are established procedures that ensure certain standards are satisfied before a project can begin.
The methodical implementation of the portfolio governance framework encompasses assessment, planning, implementation, and continuous improvement.
The Project Management Institute recommends a quartet of sequential steps to enhance the oversight of project portfolios, starting with an assessment of the existing situation, moving on to the creation of a strategic plan, implementing said plan, and finally concentrating on the improvement of these methodologies. The methods have been customized to meet the unique requirements of managing portfolios.
The assessment phase focuses on examining the current state of portfolio governance and pinpointing the desired future state that needs to be attained.
The assessment determines the degree to which the existing structure corresponds with the corporation's long-term objectives, internal configuration, and the impact of external factors. The method involves collaborating with key stakeholders to identify elements within portfolio governance that require improvement and offer potential for progress, in alignment with the anticipated future state, and assessing the organization's capacity to implement the proposed changes.
Creating an organizational framework for the portfolio entails outlining the required processes and setting a strategy to handle changes.
PMI emphasizes the critical nature of the planning phase, which involves establishing a supervisory structure, defining precise roles and the extent of control, setting up relevant governance procedures and essential communications, and developing an approach to navigate alterations throughout the project's implementation. During this phase, it is essential to establish clear roles, allocate assignments, and clearly outline the boundaries of authority in the context of the organization's governance structure.
The portfolio governance framework is put into action during the implementation phase, where its effectiveness is also evaluated.
The stage outlined by PMI emphasizes the implementation of the previously formulated plan. Primary duties include developing and altering structures for governance, implementing organizational transformation, fostering dialogue and learning, assessing and disseminating outcomes from managing projects within the organization, and supervising, supporting, and directing transitions among different elements. It is essential to evaluate the effectiveness of governance during the implementation stage by scrutinizing comprehensive reports, control systems, and analyzing critical performance metrics.
The improvement stage is centered on identifying strategies to strengthen the management of project portfolios.
Continuous monitoring is essential to ensure that information circulates properly and that governance framework practices and processes are adhered to. The procedure entails identifying emerging challenges, incorporating insights acquired throughout the execution phase, and implementing necessary adjustments to preserve the effectiveness of the portfolio governance framework.
Other Perspectives
- Oversight processes may become overly bureaucratic, potentially stifling innovation and flexibility within the organization.
- Aligning portfolio governance strictly with strategic objectives might overlook emerging opportunities that do not fit within the current strategic framework.
- The assumption that governance alignment improves resource allocation may not hold true if the strategic goals are not well-defined or if they are too rigid.
- Clarifying decision-making authority can lead to a concentration of power, which might not always result in the best decision-making, especially if it excludes input from diverse stakeholders.
- Structured methods for prioritizing and authorizing components within the portfolio may not be adaptable enough to respond to rapid changes in the market or industry.
- The methodical implementation of the governance framework might be resource-intensive and could divert attention from project execution to process adherence.
- The assessment phase could be influenced by internal politics or biases, leading to a future state vision that is not entirely objective or beneficial for the organization.
- Creating an organizational framework that is too rigid could limit the ability to adapt to unforeseen changes or external shocks.
- Evaluating the effectiveness of the portfolio governance framework during the implementation phase may not capture long-term outcomes and impacts.
- The improvement stage may become a formality rather than a genuine effort to enhance portfolio management if not properly incentivized and supported by the organization's culture.
Improving the oversight and management of how programs are executed.
The passage underscores the necessity of establishing and carrying out supervisory measures for programs to ensure the achievement of anticipated outcomes and benefits. PMI emphasizes the importance of aligning program governance with the organization's strategic goals, maintaining unity among the program's components, and balancing potential risks with expected advantages.
Establishing governance frameworks for a program aims to guide and oversee the program to ensure the achievement of the intended business outcomes.
Program governance, as defined by the Project Management Institute, involves establishing a framework, allocating responsibilities, and implementing processes that guide program management to deliver business value and fulfill the strategic and operational goals of the organization. The goal of program governance is to ensure that the program delivers the expected outcomes and benefits, while also managing how resources are distributed, controlling risks, and maintaining relationships with stakeholders.
It is essential for the governance of a program to align its objectives and benefits with the overarching strategic objectives of the organization.
PMI defines the framework of program governance as a structure ensuring that programs are aligned to deliver benefits consistent with the organization's strategic objectives. The effectiveness of a program is measured by its ability to achieve the wider goals established by the organization. To safeguard the program's role in advancing the strategic agenda and delivering expected benefits, the organization must align the program's goals with the company's strategic direction. The program manager or team assesses how well the anticipated benefits align with those actually achieved to identify any variances and recommend appropriate adjustments.
Maintaining strict oversight is crucial for aligning the different elements within the program to achieve the intended outcomes.
PMI recognizes that programs consist of multiple components, including smaller programs and individual projects, all working in concert to achieve targeted benefits and outcomes. Effective oversight of the program is essential to harmonize the components required for the realization of expected outcomes. Efforts to synchronize different components should concentrate on aligning with the broader objectives, establishing a unified strategy, tackling interrelated aspects in a holistic manner, and jointly managing the progression across the entire program.
Decision-making authority within program governance is well-defined, with clear distinctions between various roles and responsibilities.
The organization, known for its focus on project management, underscores the importance of clearly defining the responsibilities within the program's governance structure. A well-defined structure outlines the chain of command, details the decision-making processes, assigns duties, and ensures effective channels for dialogue between the program's leadership, those managing the program and its projects, the benefactors, and the key interested parties. It outlines responsibilities and promotes effective communication and collaboration among everyone involved in executing the program.
The governance framework for programs is put into action by a series of measures that include evaluating, organizing, executing, and improving.
PMI recommends a comprehensive approach that includes assessing, formulating strategic agendas, implementing, and refining the governance of programs.
The assessment phase focuses on examining the current status of program governance and determining the desired future state to be realized.
The Project Management Institute characterizes the evaluation phase as a crucial stage for comprehending the context of the program, the conditions of the organization it operates in, and the expectations of stakeholders, which are all vital components in the development of the program governance charter. Key activities during this phase involve pinpointing current governance structures within individual projects or programs and pinpointing chances to enhance process efficiency, assessing the required effort, cost, and management of organizational change necessary for implementing OPM governance, confirming that the governance frameworks for projects and programs align with those pertaining to portfolios, and determining if the organization views governance as a valuable tool for attaining its objectives.
Establishing the process involves developing a structure for governance, which is supported by necessary procedures and strategies, to manage program changes efficiently.
The Project Management Institute describes the creation of a comprehensive method for overseeing program governance, which includes the governance strategy, its structural organization, processes, and essential resources, all informed by insights gained from assessment. The approach involves creating a clear structure for managing programs that specifies the makeup of oversight bodies, delineates responsibilities, and prescribes processes for enacting changes, while also clarifying required documentation and explaining methods for communication and tackling major concerns.
During the implementation phase, the program's governance framework is put into action, and its success is evaluated.
The phase of implementation is characterized by the execution of the plan and the activation of the selected governance framework, including the establishment of roles and processes. Forming the oversight committee and clearly delineating and disseminating the roles, hierarchy, and protocols for issue escalation, as well as devising change management tactics that foster adherence and acceptance of the governance framework among program stakeholders, is an essential step.
The enhancement phase aims to strengthen the supervision and management of programs.
The organization, recognized for its project management proficiency, underscores the importance of continuous improvements to the program's governing structure. The method involves evaluating the effectiveness of the updated or existing framework and seeking feedback from those with a vested interest to identify areas for improvement. Organizations should focus on creating a system that facilitates knowledge acquisition during the implementation phase and adapts the oversight framework to reflect changing conditions or emerging needs. During this phase, it is crucial to pinpoint the program's critical components, determine their hierarchy of significance, create the initial guiding document for the program, and evaluate possible risks associated with the program.
Other Perspectives
- While establishing governance frameworks is intended to guide and oversee programs to achieve business outcomes, in practice, overly rigid frameworks can stifle creativity and innovation within the program.
- Aligning program governance with strategic goals is important, but there can be a risk of inflexibility where programs may need to adapt to unforeseen changes that are not accounted for in the original strategic goals.
- Strict oversight is crucial, but it can also lead to micromanagement, which may hinder the efficiency and motivation of the program team.
- Clearly defined decision-making authority is beneficial, but it can also create bureaucratic delays if the chain of command is too lengthy or if there is a lack of empowerment at lower levels of the program team.
- The measures for program governance, including evaluating, organizing, executing, and improving, are comprehensive, but they can also be time-consuming and resource-intensive, which may not be feasible for all organizations, especially smaller ones with limited capacity.
- The assessment phase is critical, but it can be based on assumptions that may not hold true over time, leading to a governance framework that is not responsive to real-world conditions.
- Developing a structure for governance to manage changes efficiently is important, but such structures can sometimes be resistant to change themselves, especially if they become entrenched within the organization.
- The implementation phase's focus on putting the governance framework into action and evaluating success is key, but success metrics can sometimes be too narrow or short-term focused, missing the bigger picture or long-term implications.
- The enhancement phase's aim to strengthen supervision and management can lead to continuous changes that may result in governance fatigue among program staff, where constant updates and changes become a burden rather than a benefit.
Improving the oversight and administration of projects.
The passage highlights the application of governance principles within the scope of singular projects. PMI emphasizes that the framework for managing projects operates separately from the oversight processes utilized for portfolios and programs. The excerpt emphasizes the necessity for active participation by individuals responsible for governance and the project's sponsor, along with integrating appropriate knowledge and tactics to manage change efficiently.
Governance plays a crucial part in guiding and overseeing projects to guarantee the delivery of expected outcomes, products, or services, and its importance should not be underestimated.
Project governance, as characterized by the Project Management Institute, encompasses the framework and systematic measures that guarantee the management of projects in a manner conducive to producing a unique product, service, or result that is in harmony with the strategic and operational goals of the organization. The guide provides recommendations for project overseers and other stakeholders on how to ensure that project management is in harmony with the unique characteristics of the project while adhering to the company's objectives and standards.
The project's success hinges significantly on the active involvement and backing of both the governing body and the project sponsor in managing its governance.
The success of project governance is significantly affected by the active involvement and support of the governing body and the project sponsor, as emphasized by the Project Management Institute. Executive leadership is anticipated to meticulously oversee and examine the project for significant issues or risks, ensuring that these efforts are in sync with the organization's primary strategic goals. Throughout its entire lifespan, the project remains in continuous alignment with the organization's strategic objectives. An individual who is likely to gain from the successful outcome of the project is anticipated to passionately advocate for the project, actively advance its objectives, clear away hindrances, and provide the necessary resources for its successful realization.
The implementation of project governance is crucial as it offers the required guidance and expertise to steer organizational transformations.
Organizations are advised to acquire the essential skills and backing to handle changes skillfully, thus guaranteeing the effective finalization of projects. The organization in charge must identify and secure the necessary expertise or assistance, either internally or through designated representatives, to address particular challenges encountered during the execution of the project. Essential competencies for the project may include expertise in technology, legal matters, financial management, or other pertinent domains. The responsibility for effectively steering changes within the organization rests with the governing body and the sponsor. This involves predicting the impact of the project's outcomes on the organization and its stakeholders, and preparing those who will be affected for the impending changes. The sponsor and project manager work together to identify necessary resources and actions to manage change effectively, ensuring a seamless transition that focuses on overcoming business obstacles to fully realize the benefits of the change.
It is essential for the sponsor and governing body to have the requisite authority and expertise.
To fulfill their responsibilities adequately, the project's advocate and the supervisory committee must have the necessary authority and skills, as emphasized by PMI. The organization's top governing body must clearly delegate decision-making powers to the governing body in relation to their specific responsibilities for certain projects. The project proponent must have the requisite influence and power within the company to secure resources, surmount challenges, and fervently support the initiative's objectives. The project supervisor and the management team must possess the necessary skills to offer strong guidance, support, and supervision for both the project leaders and their team members. The accomplishment of the project is contingent upon anticipating and adjusting to changes, building trust within the team, making firm decisions, encouraging innovative solutions, and evaluating the progress and outcomes of the project.
The methodical process of implementing governance structures for projects includes assessment, planning, carrying out, and refining.
The establishment of a project governance framework, which involves systematic supervision similar to that used for portfolios and programs, requires a repetitive process of assessment, planning, implementation, and improvement, as advised by PMI, and is customized to address the specific challenges and conditions of project management.
Assessing the current framework that governs projects and formulating a clear vision for its forthcoming development is an essential phase in the process.
The initial assessment involves a detailed analysis of the existing framework for governing projects, which includes regulations, structural systems, and processes, to recognize strengths and pinpoint areas that require enhancement, as outlined by the leading authority on project management. The assessment should include stakeholder engagement to identify their needs and expectations. The project team is responsible for assessing how different aspects of the organization, including its cultural norms, risk tolerance, and available resources, might influence the project.
Establishing an initial structure for the organization, outlining processes, and formulating a strategy to handle potential alterations during the project's lifespan is essential.
After the assessment, the planning stage, as described by PMI, requires the development of a comprehensive plan that explicitly establishes the structure for overseeing projects within the governance management context. The approach includes delineating distinct responsibilities, pinpointing those who have the power to decide, formulating a plan for interaction, and acknowledging the necessary skills, while also tackling the obstacles associated with implementing change.
During the execution phase, the effectiveness of the project governance framework is evaluated.
Creating the governance framework involves establishing the structure of the organization, assigning roles, communicating the governance system to stakeholders, initiating processes for managing change, and gathering data to monitor the project's advancement in comparison to the initial plan, as described by PMI.
The enhancement stage is focused on identifying methods to enhance the oversight of projects.
Lastly, PMI underscores the ongoing commitment to advancing the oversight and control within the realm of project management. During the enhancement stage, it is crucial for the project team to diligently document the lessons learned and identify possible enhancements to the project's framework, based on their hands-on experience with the existing processes. Adjustments in the supervisory structure may be required, which could result in an overhaul of how decisions are made, improvements in the ways we communicate, and a clearer delineation of duties and responsibilities. The primary objective is to foster an environment that consistently encourages learning and the acquisition of knowledge at all levels, which in turn significantly enhances the effectiveness of overseeing projects and contributes greatly to the project's success.
Other Perspectives
- Governance principles, while essential, can sometimes become bureaucratic and stifle the agility needed in project management.
- Systematic measures for project governance may not always account for the unique and dynamic challenges of every project, potentially leading to a one-size-fits-all approach.
- The active involvement of the governing body and project sponsor, though crucial, can sometimes lead to micromanagement, which can hinder the project team's ability to operate effectively.
- Project governance can provide guidance for organizational transformations, but it can also be seen as an overhead that does not directly contribute to the operational work of the project.
- The necessity for sponsors and governing bodies to have authority and expertise is clear, but this can create a bottleneck if these individuals are not available or if their involvement is too time-consuming.
- The process of implementing governance structures, while methodical, can be slow and may not keep pace with the rapid changes often required in project environments.
- Assessing the current project governance framework is important, but it can also be resource-intensive and detract from the actual work of the project.
- While establishing a structure and outlining processes are essential, they can sometimes be overly prescriptive and limit the flexibility needed for innovative solutions.
- Evaluating the effectiveness of the project governance framework during execution is critical, but it can also be difficult to measure and attribute success or failure directly to governance practices.
- Enhancements in project oversight are important, but continuous change can lead to governance fatigue among project team members.
Want to learn the rest of Governance of Portfolios, Programs, and Projects in 21 minutes?
Unlock the full book summary of Governance of Portfolios, Programs, and Projects by signing up for Shortform.
Shortform summaries help you learn 10x faster by:
- Being 100% comprehensive: you learn the most important points in the book
- Cutting out the fluff: you don't spend your time wondering what the author's point is.
- Interactive exercises: apply the book's ideas to your own life with our educators' guidance.
Here's a preview of the rest of Shortform's Governance of Portfolios, Programs, and Projects PDF summary:
What Our Readers Say
This is the best summary of Governance of Portfolios, Programs, and Projects I've ever read. I learned all the main points in just 20 minutes.
Learn more about our summaries →Why are Shortform Summaries the Best?
We're the most efficient way to learn the most useful ideas from a book.
Cuts Out the Fluff
Ever feel a book rambles on, giving anecdotes that aren't useful? Often get frustrated by an author who doesn't get to the point?
We cut out the fluff, keeping only the most useful examples and ideas. We also re-organize books for clarity, putting the most important principles first, so you can learn faster.
Always Comprehensive
Other summaries give you just a highlight of some of the ideas in a book. We find these too vague to be satisfying.
At Shortform, we want to cover every point worth knowing in the book. Learn nuances, key examples, and critical details on how to apply the ideas.
3 Different Levels of Detail
You want different levels of detail at different times. That's why every book is summarized in three lengths:
1) Paragraph to get the gist
2) 1-page summary, to get the main takeaways
3) Full comprehensive summary and analysis, containing every useful point and example